<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Airports Archivi - Rizzani de Eccher</title>
	<atom:link href="https://rde.it/en/sectors/infrastructure/airports/feed/" rel="self" type="application/rss+xml" />
	<link>https://rde.it/en/sectors/infrastructure/airports/</link>
	<description>General contractor</description>
	<lastBuildDate>Tue, 11 Mar 2025 15:38:41 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.1</generator>

<image>
	<url>https://rde.it/wp-content/uploads/2021/10/cropped-favicon_deccher-32x32.png</url>
	<title>Airports Archivi - Rizzani de Eccher</title>
	<link>https://rde.it/en/sectors/infrastructure/airports/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Rail connection with Venice Airport</title>
		<link>https://rde.it/en/projects/rail-connection-with-venice-airport/</link>
		
		<dc:creator><![CDATA[sdelia]]></dc:creator>
		<pubDate>Mon, 05 Feb 2024 15:36:50 +0000</pubDate>
				<guid isPermaLink="false">https://rde.it/?post_type=progetti&#038;p=8860</guid>

					<description><![CDATA[Description The project, being undertaken on behalf of RFI Rete Ferroviaria Italiana, consists of the &#8220;executive design and contracted execution of the works for the construction of the Railway Link to Venice Airport&#8221; and is outlined in a new double-track railway line of about 8 km, of which 3.4 km will be in a tunnel, [&#8230;]]]></description>
										<content:encoded><![CDATA[
<a href='https://rde.it/wp-content/uploads/2024/01/Stazione-della-bretella-di-collegamento-ferroviario-allaeroporto-di-Venezia.jpeg'><img fetchpriority="high" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2024/01/Stazione-della-bretella-di-collegamento-ferroviario-allaeroporto-di-Venezia-500x500.jpeg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2024/01/Stazione-della-bretella-di-collegamento-ferroviario-allaeroporto-di-Venezia-500x500.jpeg 500w, https://rde.it/wp-content/uploads/2024/01/Stazione-della-bretella-di-collegamento-ferroviario-allaeroporto-di-Venezia-150x150.jpeg 150w" sizes="(max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2024/01/Aeroportodivenezia1388.jpg'><img decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2024/01/Aeroportodivenezia1388-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2024/01/Aeroportodivenezia1388-500x500.jpg 500w, https://rde.it/wp-content/uploads/2024/01/Aeroportodivenezia1388-150x150.jpg 150w" sizes="(max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2024/02/Venezia-6-12.02.png'><img decoding="async" width="500" height="456" src="https://rde.it/wp-content/uploads/2024/02/Venezia-6-12.02-500x456.png" class="attachment-square_medium size-square_medium" alt="" /></a>
<a href='https://rde.it/wp-content/uploads/2024/02/DJI_0728-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2024/02/DJI_0728-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2024/02/DJI_0728-500x500.jpg 500w, https://rde.it/wp-content/uploads/2024/02/DJI_0728-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2024/02/DJI_0731-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2024/02/DJI_0731-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2024/02/DJI_0731-500x500.jpg 500w, https://rde.it/wp-content/uploads/2024/02/DJI_0731-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2024/02/DJI_0735-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2024/02/DJI_0735-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2024/02/DJI_0735-500x500.jpg 500w, https://rde.it/wp-content/uploads/2024/02/DJI_0735-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>

<h4>Description</h4>
<p>The project, being undertaken on behalf of RFI Rete Ferroviaria Italiana, consists of the &#8220;executive design and contracted execution of the works for the construction of the Railway Link to Venice Airport&#8221; and is outlined in a new double-track railway line of about 8 km, of which 3.4 km will be in a tunnel, that will connect the existing main Venice-Trieste railway line with Marco Polo International Airport.</p>
<p>The new railway infrastructure, will run alongside the highway link road approaching the Airport through a tunnel, where it is planned to build a two-track underground station connected to the airport terminal. Benefiting from this strategic project will be a local supply chain of more than 300 suppliers, subcontractors and operators.</p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Keflavik Airport Hangar</title>
		<link>https://rde.it/en/projects/keflavik-airport-hangar/</link>
		
		<dc:creator><![CDATA[fdeeccher]]></dc:creator>
		<pubDate>Tue, 23 Aug 2022 15:41:50 +0000</pubDate>
				<guid isPermaLink="false">https://rde.it/?post_type=progetti&#038;p=4213</guid>

					<description><![CDATA[Description The work involves the remodeling of hangar 831 and the construction of a facility where aircraft can be washed. The goal of the project is to improve facilities for NATO maritime patrol aircraft. This is part of a much larger project that the US government is undertaking at Keflavík International Airport. The project is [&#8230;]]]></description>
										<content:encoded><![CDATA[
<a href='https://rde.it/wp-content/uploads/2022/08/IMG_20220714_085722-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/IMG_20220714_085722-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/IMG_20220714_085722-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/IMG_20220714_085722-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084206-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084206-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084206-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084206-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145713-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145713-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145713-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145713-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/20201027_083725-scaled.jpeg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/20201027_083725-500x500.jpeg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/20201027_083725-500x500.jpeg 500w, https://rde.it/wp-content/uploads/2022/08/20201027_083725-150x150.jpeg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/20210226_092739-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/20210226_092739-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/20210226_092739-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/20210226_092739-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/Hanger-02.png-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/Hanger-02.png-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/Hanger-02.png-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/Hanger-02.png-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145631-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145631-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145631-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/IMG_20220713_145631-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084450-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084450-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084450-500x500.jpg 500w, https://rde.it/wp-content/uploads/2022/08/IMG_20220714_084450-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>

<h4>Description</h4>
<p>The work involves the remodeling of hangar 831 and the construction of a facility where aircraft can be washed. The goal of the project is to improve facilities for NATO maritime patrol aircraft. This is part of a much larger project that the US government is undertaking at Keflavík International Airport. The project is twofold: part of it is arranged by the US Navy and the other part by the US Air Force.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Al Udeid Air Base</title>
		<link>https://rde.it/en/projects/al-udeid-air-base/</link>
		
		<dc:creator><![CDATA[interlaced]]></dc:creator>
		<pubDate>Mon, 22 Nov 2021 05:34:31 +0000</pubDate>
				<guid isPermaLink="false">http://rde.it/?post_type=progetti&#038;p=226</guid>

					<description><![CDATA[Illum consequatur vel veritatis dolorem numquam nobis ratione vel et aliquid laborum suscipit earum voluptatem nihil enim commodi tempore nesciunt odit et maxime qui id est tempora praesentium at ea quam et minima quod inventore quia molestiae odit id quibusdam illo nihil eum esse magni deleniti autem quo dolor at consectetur quam nesciunt qui sint exercitationem quia pariatur saepe et occaecati dolorem libero voluptas doloremque itaque numquam consequuntur voluptatem distinctio quo voluptatem aut culpa qui alias eum consequatur non rem perspiciatis minima quae laborum tempore doloribus quasi recusandae architecto quisquam id deserunt et quos incidunt dolor doloribus architecto occaecati vel quos quisquam reiciendis dignissimos.

Fugiat et alias aut deleniti ut voluptatibus delectus ex eveniet quam voluptas alias officiis doloremque cumque quae labore est unde blanditiis suscipit aspernatur nobis illo aut sunt pariatur corporis dolor sit aut ut incidunt id voluptate ipsam distinctio voluptatibus voluptate odit dolorum quisquam quo voluptates dolores nihil sed tempora repellendus animi ipsum est nemo distinctio velit asperiores sint sequi repellat ullam error doloribus iste assumenda consectetur atque id quia quia dolores ullam harum fuga sunt voluptatem sint quis est.]]></description>
										<content:encoded><![CDATA[
<a href='https://rde.it/wp-content/uploads/2021/11/14968959616_82bd620f11_o.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2021/11/14968959616_82bd620f11_o-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2021/11/14968959616_82bd620f11_o-500x500.jpg 500w, https://rde.it/wp-content/uploads/2021/11/14968959616_82bd620f11_o-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>
<a href='https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_06.jpg'><img loading="lazy" decoding="async" width="350" height="350" src="https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_06-350x350.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_06-350x350.jpg 350w, https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_06-150x150.jpg 150w" sizes="auto, (max-width: 350px) 100vw, 350px" /></a>
<a href='https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_02.jpg'><img loading="lazy" decoding="async" width="350" height="350" src="https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_02-350x350.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_02-350x350.jpg 350w, https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_02-150x150.jpg 150w" sizes="auto, (max-width: 350px) 100vw, 350px" /></a>
<a href='https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_01.jpg'><img loading="lazy" decoding="async" width="350" height="350" src="https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_01-350x350.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_01-350x350.jpg 350w, https://rde.it/wp-content/uploads/2021/11/RdE-al-udeid-air-base_gallery_01-150x150.jpg 150w" sizes="auto, (max-width: 350px) 100vw, 350px" /></a>
<a href='https://rde.it/wp-content/uploads/2021/11/USAFCENT_CAOC-scaled.jpg'><img loading="lazy" decoding="async" width="500" height="500" src="https://rde.it/wp-content/uploads/2021/11/USAFCENT_CAOC-500x500.jpg" class="attachment-square_medium size-square_medium" alt="" srcset="https://rde.it/wp-content/uploads/2021/11/USAFCENT_CAOC-500x500.jpg 500w, https://rde.it/wp-content/uploads/2021/11/USAFCENT_CAOC-150x150.jpg 150w" sizes="auto, (max-width: 500px) 100vw, 500px" /></a>

<h4>Description</h4>
<p>Design and construction of facilities and infrastructure of one of the most strategically important air bases of the Persian Gulf located approximately 45 km South-east of Doha.</p>
<p>The scope included design, supply, construction, installation, testing and commissioning, and warranty of all works (civil &amp; MEP) related to power distribution.</p>
<p>In addition to civil construction and MEP works for sub-stations, HV panel, transformers, 11 KV cabling and miscellaneous accessories were all provided to local authority requirements.</p>
<p>The project was carried out under the constant monitoring of a sophisticated security service and with strict secrecy requirements, due to the nature of installation.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
