Fincantieri Naval Workshop
- Noordwijk, The Netherlands
- Industrial Buildings
- Ongoing
€10M
Total investmentHighlights
- Concrete 186 m3;
- Steel structure 24 tons;
- Glazing wall façade 100 sqm;
- Offices: 600 sqm.
Description
Extension of the newly extended FJ building to join up with the existing FV building. Accessory work, consisting in a above ground connection between the two sheds, built with cantilever system, which allows the satellites to be transported between the two buildings in a clean room environment. A small office building it’s included in the SoW along with a main atrium, a multifunctional area and a corridor extension.
Companies involved