Arneg IV

Design and construction of an industrial refrigerating units and shelves production facility

Industrial Buildings
  • Naro-Fominsk, Russia
  • Industrial Buildings
  • Completed

$25M

Total investment

10,000

mq

Highlights

  • Delivered in only 14 months;
  • Area of 25,000 sqm.

Description

Construction contract with OOO Arneg for the expansion of their factory in Naro-Fominsk (60km to the south-west of Moscow). The existing plant was built also by the Group.
The expansion, including design and technical assistance, will consist of the construction of a new 10,000 sqm factory for manufacturing refrigerated shelves and displays for the food retailing industry and the landscaping of the surrounding 25,000 sqm area. Delivery is scheduled in 14 months from the start of construction.