Doha Metro Red Line

Design and construction of a 6.7km long section of the red metro line in Doha

Tunnels
  • Doha, Quatar
  • Bridges & Viaducts, Mass Transit, Tunnels
  • Completed: 2020

$600M

Total investment

Highlights

  • Total length 6,7 km;
  • Bridge length 2.225 m;
  • Max span length 44 m;
  • Deck surface 25.000 sqm.

Description

Construction of the Red North Elevated and at-grade section of Doha Metropolitan network, running from a connection with Lusail’s light rail line to Msheireb via West Bay, with an overall length of 6,7 km.
Works comprised the design and construction of all civil engineering and building works for the Metro section, including elevated structures, at-grade section, a cut and cover tunnel, one at-grade station, one elevated station, and stabling areas.
The elevated structures were of the segmental span by span type and were erected by overslung launching girders.