Westconnect – M4 Widening
Transanatholian Highway
Construction of a motorway section of one of the most important highway in Turkey
- Tarsus-Mersin, Turkey
- Bridges & Viaducts, Motorways & Roads
- Completed: 2000
€80M
Total investment144.760
mqHighlights
- Bridge length 11.000 m;
- Max span length 39 m;
- Deck surface 144.760 sqm;
- Deck width 16,35 m;
- Bitumen 26.000 tons.
Description
Detailed engineering and construction of double carriageway viaducts in the Tarsus-Mersin section of the Transanatholian Highway.
The viaducts, whose total length reaches 11 km, were built with precast prestressed simply supported beams, in-situ upper decks. The maximum span length is 39 m, while the deck is 16,35 m wide, with a total surface of 114.760 sqm. 26.000 tons of bitumen were used for the road pavement.
Companies involved