S.S. 341 “Gallaratese”
Ragusana State Road
Execution of new Lot No. 3 - from junction No. 5 "Grammichele" to junction No. 8 "Francofonte"
- Sicily, Italy
- Bridges & Viaducts, Motorways & Roads
- Ongoing (Completion date: 2026)
€222M
Total investmentHighlights
- Route development 18,100 km;
- Adaptation of Secondary Roads;
- No. 1 4-span Piano delle Rose Viaduct;
- 2 New overpasses;
- N° 3 Interchanges: Interchange 5 “Grammichele”- Interchange 6 “Vizzini Scalo” – Interchange 7 “Vizzini”;
- No. 8 Road underpasses
Description
The project consists of the construction of a new section of State Road SS No. 514 Ragusana for a development of about 18 km in total. The project is the modernization of the existing section with the widening to 4 lanes with a platform width of L=22.00m, while at the entrances and exits it changes to a total width of 29.50m.
Major works of art and secondary road works are planned along the route. A part of the route is developed for about 4.200km as a variant and the remaining 13.900km as a widening to the existing highway.