US181 Harbor Bridge Project Corpus Christi

Replacement of the existing Harbor Bridge and reconstruction of portions of US 181

Ponti e Viadotti
  • Texas, USA
  • Ponti e Viadotti, Infrastrutture
  • In corso (Completamento previsto: 2024)

Highlights

  • Deck surface 20.000 sqm.

Description

The project involves the development, design, construction, and maintenance of a totalof 6.44 miles of bridge and connecting roads. Rizzani de Eccher USA supplied 1 launching gantry and provided technical assistance.

Aziende coinvolte

Rizzani de Eccher USA Deal

Progetti correlati

Il gruppo

General contracting

Specialized contracting

Altre attività