Taiwan High-Speed Rail System
Design and construction of primary viaduct superstructure
- Kaohsiung, Taiwan
- Bridges & Viaducts, Mass Transit
- Completed: 2005
$60M
Total investmentHighlights
- Deck area 23,000 m²;
- total number of spans 611;
- concrete 180,000 m³;
- reinforcing steel 27,500 t.
Description
Final design and construction of primary viaduct superstructure , including provision of labor, precast and erection equipment, and engineering services.
The total length of the Tai Pei – Kaohsiung elevated section is 19 km.
The works consisted of fabrication and erection of 596 precast pre-tensioned concrete box girders, construction of five cast-in-place post-tensioned bridges, fabrication and installation of approx. 10,000 parapets, installation of cable troughs and derailment walls.