Crown Princess Mary Bridge – Frederikssund Fjord Link
- British Columbia, Canada
- Bridges & Viaducts
- Completed: 2009
Highlights
- Max span length 47,28 m;
- Deck surface 105.000 sqm.
Description
Rizzani de Eccher USA supplied BC Launching Truus, 5 Casting machines, Straddle Carrier, and Lifting Frames for Cable Stay bridge, along with Technical Assistance.