Crown Princess Mary Bridge – Frederikssund Fjord Link
Marghera Bridge
Construction of a cable-stayed bridge over the West Channel in the Port of Venice
- Venezia
- Bridges & Viaducts
- Completed: 2005
€35M
Total investment10,048
mqHighlights
- Lenght of over 400 m;
- main span of 126 m;
- total deck area of around 10,000 m2.
Description
The cable-stayed bridge crosses the West Channel in the industrial area of the Port of Venice, linking Marghera’s dry land with the port island.
It has two travel lanes in each direction. Its deck is a mixed steel and concrete caisson structure supported by nine steel cables.
Companies involved